The PM assigned the Minister of Planning and Investment as the Chairman of the State verification council to select the consulting unit, while gathering ideas of other ministries to maximize the effectiveness and economies the hiring.

The Metro line 5, spanning from the new Can Giuoc coach station to Sai Gon bridge, has a total length of 26 kilometers.

In the first phase, an 8.9km section will be built from Bay Hien crossroad in Tan Binh district to Sai Gon bridge.

leftcenterrightdel
Ho Chi Minh City metro project map. Source: baoxaydung.com.vn

The line has a total investment of 1.562 billion EUR and an implementation time from 2009 to 2027.

Under its design, the Metro line 5 will connect with line 2 at Bay Hien crossroad, line 4 at Phu Nhuan crossroad in Phu Nhuan district, Tan Son Nhat airport terminal in Tan Binh district, line 3b at Hang Xanh station in Binh Thanh district and line 1 at Sai Gon brodge station in Binh Thanh district.

HCM City’s metro project was the first proposed in 2001 as part of a comprehensive public transport plan for the city and neighboring provinces to tackle traffic congestion.

It includes three monorail lines with a total length of 37km and six partly underground metro routes running a total of 107km from Ben Thanh to Suoi Tien, Ben Thanh to Tham Luong, Ben Thanh to Binh Tan, Lang Cha Ca to Van Thanh, Thu Thiem to Can Giuoc and Ba Queo – Phu Lam. Ben Thanh will be a hub connecting all the lines.

According to initial estimates in 2007, total investment of the project was 17 trillion VND (about 749 million USD). However, a recent calculation of Japanese consultant joint venture, verified by a Singaporean independent consultant unit, showed the total cost will be 47 trillion VND (2.07 billion USD). So far, 51 percent of the project’s workload has been completed and the project is scheduled to be finished in 2020.

Source: VNA