The People’s Army Newspaper would like to introduce images of the brigade’s troops in river-crossing training.

leftcenterrightdel
A PTS amphibious vehicle with troops and a truck on board crossing a river
leftcenterrightdel
 
leftcenterrightdel
A canoe moving the PMP pontoon bridge
leftcenterrightdel
The brigade’s troops beginning to build a pontoon bridge
leftcenterrightdel
Each section of the pontoon bridge is carefully moved
leftcenterrightdel
A truck is transported across the river
leftcenterrightdel
GSP bridge being connected
leftcenterrightdel
 
leftcenterrightdel
All troops closely following commander’s instructions
leftcenterrightdel
The GSP bridge parts are able to transport PTS amphibious vehicle
leftcenterrightdel
Troops collaborating together smoothly
leftcenterrightdel
Thanks their good physical health and excellent professional expertise, engineering troops completing  missions successfully.

Translated by Trung Thanh