Spanning the Bac Lieu – Ca Mau river, the bridge was built at a cost of VND 540 billion (USD 2.37 million), sourced from the Government bond funding. The facility is over 650 meters in length and 15 meters in width, with three consecutive spans. 

leftcenterrightdel
The Tran Van Som Bridge. (Photo: tuoitre.vn) 

The construction of the bridge began in 2012, aiming to facilitate goods transport from Ganh Hao sea mouth, a major fishery hub in Bac Lieu’s Dong Hai district, to neighboring areas for processing and export. 

Vice Chairman of the Bac Lieu People’s Committee Phan Nhu Nguyen said the bridge is part of a local plan to develop transport infrastructure by 2020. 

This is also an important route of the Ho Chi Minh road that provides the shortest travel from the west sea to the east sea through Ganh Hao, he noted.

Source: VNA